Mchinery Design

Machinery Design is design of machinery part of ship, and is to prepare arrangement

of engine room together with several drawings of outfit and piping diagram including relevant

calculation for machinery part. Production drawings are out of our scope, in general.

However, if requested, fabrication drawings, piece drawings and support plans may be

acceptable. Typical drawings and documents of ‘Machinery Design’ for Bulk Carrier are

listed as follows for Example.

1. BASIC CALCULATION OF MACHINERY
2. HEAT BALANCE DIAGRAM OF COOLING WATER SYSTEM
3. MACHINERY PARTICULARS
4. SHEME OF ON BOARD TEST FOR MACHINERY PART
5. RESULT OF ON BOARD TEST FOR MACHINERY PART
6. ARRANGEMENT OF SHAFTING
7. PROPELLER SHAFT, INTERMEDIATE SHAFT
8. TORSIONAL VIBRATION ANALSIS FOR SHAFTING SYSTEM
9. SHAFT ALIGNMENT CALCULATION
10. ARRANGEMENT OF ENGINE ROOM
11. ARRANGEMENT OF ENGINE ROOM STORE
12. ARRANGEMENT OF ENGINE CONTROL ROOM
13. ARRANGEMENT OF ENGINE ELECTRIC STORE
14. VENTILATION DIAGRAM IN MACHINERY SPACE
15. VENTILATION TRUNK ARRANGEMENT IN MACHINERY SPACE
16. CALCULATION FOR ENGINE ROOM VENTILATION RESISTANCE
17. ARRANGEMENT OF LADDER & GRATINGS IN ENGINE ROOM
18. ARRANGEMENT OD SEA CHEST & SHIP SIDE VALVE
19. ARRANGEMENT OF ENGINE ROOM WORK SHOP
20. FOUNDATION LIST FOR ENGINE PART
21. FOUNDATION FOR ENGINE PART
22. CONSTRUCTION OF SMALL TANKS IN ENGINE ROOM
23. FITTING ARRANGEMENT OF HULL TANK IN ENGINE ROOM
24. LIST OF L.O.
25. TOOLS LIST
26. SPARE PARTS LIST FOR MACHINERY PART
27. PIPING DIAGRAM IN MACHINERY SPACE
28. VALVE LIST FOR ENGINE ROOM
29. VALVE NAME PLATE FOR ENGINE ROOM
30. PIPING LIST FOR ENGINE ROOM
31. ARRANGEMENT OF M/E EXHAUST GAS PIPING
32. (MAIN ENGINE INSTALLATION PLAN
33. PING ARRANGEMENT IN DOUBLE BOTTOM IN E/R
34. PIPING ARRANGEMENT IN FUNNEL
35. FUNNEL ACCESSORIES
36. PIPING ARRANGEMENT ON DOUBLE BOTTOM IN E/R
37. PIPING ARRANGEMENT OF UNDER 4TH DECK IN E/R
38. PIPING ARRANGEMENT OF ON 4TH DECK IN E/R
39. PIPING ARRANGEMENT OF UNDER 3RD DECK IN E/R
40. PIPING ARRANGEMENT OF ON 3RD DECK IN E/R
41. PIPING ARRANGEMENT OF UNDER 2ND DECK IN E/R
42. PIPING ARRANGEMENT OF ON 2ND DECK IN E/R
43. PIPING ARRANGEMENT OF UNDER UPPER DECK IN E/R
44. PIPING ARRANGEMENT OF ENGINE CASING
45. PIPING ARRANGEMENT OF M/E L.O. SUMP TANK